Portland Square - 10th August 2001
|
Assembly of the second tower crane was completed today - here you can see the jib being lifted into position using a 300 tonne capacity mobile crane which came down from Bristol for the day.
|
The second tower crane is taller than the first one; it also has a higher lift capacity and a greater reach.
|
| Portland Square - 14th August 2001 |
Here's an overview of the site taken from the top of the Davy Building, looking north.
|
The first elements of the steel framework for Block C were delivered to site today. The main shear frame which weighed some 18 tonnes was too heavy to be lifted by either of the site's tower cranes; a mobile crane was used instead.
|
|
|