Updated: |
|||||||||
|
||||||||||
Introduction. If you don't have QuickTime then you can still get a better look at the project - use the Wide links below to see the VR panoramas flattened out into w....i....d....e pictures.
|
|||||||||
| Friday 1st December 2000.
|
|||||||||
| Tuesday 5th December 2000. This panorama was taken during the installation of the second batch of modules - on a cold, windy and wet afternoon - typical weather in other words. You can clearly see the jib of the mobile crane which was used to lift the modules onto the roof; three new modules had so far been placed on the western end of the roof. Other tasks were also being undertaken - you can see the men working on installing fire stops.
|
|||||||||
| Friday 15th December 2000. These panoramas were taken as the last of the modules were being lifted into position. Part of the floor has now been laid; steelwork for the roof and cladding systems has been stockpiled around the site.
|
|||||||||
|
|||||||||
|
|